The Mission will be implemented during 2015-2022 and will provide central assistance to Urban Local Bodies (ULBs) and other implementing agencies through States/UTs for:
1. In-situ Rehabilitation of existing slum dwellers using land as a resource through private participation
2. Credit Linked Subsidy
3. Affordable Housing in Partnership
4. Subsidy for Beneficiary-led individual house construction/enhancement.
Credit linked subsidy component will be implemented as a Central Sector Scheme while other three components will be implemented as Centrally Sponsored Scheme (CSS).
Beneficiaries
- The mission seeks to address the housing requirement of urban poor including slum dwellers. A slum is defined as a compact area of at least 300 people or about 60 – 70 households of poorly built congested tenements in unhygienic environment usually with inadequate infrastructure and lacking in proper sanitary and drinking water facilities.
- Beneficiaries include Economically weaker section (EWS), low-income groups (LIGs) and Middle Income Groups (MIGs). The annual income cap is up to Rs 3 lakh for EWS, Rs 3-6 lakh for LIG and Rs 6 + -18 lakhs for MIG. EWS category of beneficiaries is eligible for assistance in all four verticals of the Missions whereas LIG and MIG categories are eligible under only Credit linked subsidy scheme (CLSS) component of the Mission.
- For identification as a EWS or LIG beneficiary under the scheme, an individual loan applicant will submit self-certificate/ affidavit as proof of income.
- A beneficiary family will comprise husband, wife, unmarried sons and/or unmarried daughters.
- The beneficiary family should not own a pucca house either in his/her name or in the name of any member of his/her family in any part of India to be eligible to receive central assistance under the mission.
- States/UTs, at their discretion, may decide a cut-off date on which beneficiaries need to be resident of that urban area for being eligible to take benefits under the scheme.
At the slum decadal growth rate of 34%, the slum households are projected to go upto 18 million. 2 million non-slum urban poor households are proposed to be covered under the Mission. Hence, total housing shortage envisaged to be addressed through the new mission is 20 million.
Source:Vikaspedia